CLIENT

Village of Barrington

LOCATION​

Illinois

PROJECT FEATURES
  • Access Improvements
  • Roadway Improvements
  • Pedestrian Improvements
  • ADA Compliance
  • Traffic Signal
  • Utility Improvements
  • Stakeholder Coordination
  • Land Acquisition
  • Federal Funding
SCOPE OF SERVICES
  • Topographic Survey
  • Boundary Survey
  • Plats of Highway
  • Public Engagement
  • Roadway Phase I Design
  • Roadway Phase II Design
  • Project Development Report
  • Transportation Planning
  • Traffic Study
  • Traffic Signal Design
  • Stormwater Management
  • Utility Design

Gewalt Hamilton Associates, Inc. (GHA) was retained by the Village of Barrington to improve access to the Metra Parking lot. The Village of Barrington was able to secure STP funds for the construction of a new signalized intersection along US Route 14 (Northwest Hwy) to serve the Metra parking lot. As part of the improvement, the full access at Klingenberg Lane would be restricted to a right-in/right-out access with all movements occurring at the new signalized access to US Route 14.

The project includes the widening of US 14 to provide a southbound right-turn lane at the new three-lane Metra access.

Fabyan Preserve Pedestrian Bridge
Cancer Treatment Centers of America