CLIENT

Village of Mount Prospect

LOCATION​

Mount Prospect, IL

PROJECT FEATURES
  • Bicycle & Pedestrian Improvements
  • Roadway Improvements
  • Traffic Signals
  • ADA Compliance
SCOPE OF SERVICES
  • Topographic Surveys
  • Preliminary Engineering
  • Final Engineering
  • Roadway Phase II Design
  • Roadway Phase III Construction
  • Resident Engineering
COST

$1.1 Million

Since 2018, GHA has been assisting the Village of Mount Prospect by providing design and construction engineering services related to implementing planned pedestrian safety improvements at key intersections throughout the Central Road corridor. Typical work for these projects includes the construction of a pedestrian refuge island, roadway widening, improved signage to enhance pedestrian visibility, and associated sidewalk improvements. GHA developed alternates to determine the best design at each intersection, presented the preferred alternate to the Village’s Transportation Safety Commission, and coordinated with IDOT to receive the necessary permits for work on Central Road.

Lake Zurich Cusd 95 – May Whitney
Heritage Oaks Golf Club Improvements