CLIENT

Lake Zurich Community Unit School District 95

LOCATION​

Lake Zurich, IL

PROJECT FEATURES
  • Access Improvements
  • Circulation Improvements
  • Athletic Fields – Synthetic
  • Athletic Fields Baseball/Softball
  • Parking Lot Rehabilitation
  • Stormwater Improvements
  • Stormwater Management
  • Sustainable Design
  • ADA Compliance
  • Tennis Courts (8)
  • Track and Field (8 lanes)
  • Transportation Planning
  • Utility Improvements
  • Water Resources
  • Wetlands
SCOPE OF SERVICES
  • Topographic Surveys
  • Boundary Survey
  • Capital Improvement Planning
  • Conceptual Planning
  • Traffic & Parking Studies
  • Entitlement Process
  • Preliminary Engineering
  • Final Engineering
  • Stormwater Management
  • Utility Design
  • Wetland Delineation / Permitting
  • Construction Observation
  • Construction Layout
  • NPDES Inspections
COST

$3.5 Million Constructed to Date
$2.5 Million Under Construction

Gewalt Hamilton Associates, Inc. (GHA) has provided civil engineering services for Lake Zurich CUSD 95 for nearly fifteen years. We have assisted the District in improving various infrastructure on their High School campus from pavement patching projects to complicated retrofits/upgrades. Site challenges include offsite and onsite wetlands, stormwater improvements, relief across the site, coordination with IDOT, and improving outdated infrastructure in a confined area.

Athletic Improvements
• Synthetic turf replacement
• Stadium infrastructure replacement
• Baseball and Softball fields drainage, grading and warning track upgrades
• Tennis Court addition and reconstruction (8)
• Track resurfacing and upgrades

Site Improvements
• Parking lot reconstruction with circulation improvements
• Secured entry improvements
• Accessibility upgrades throughout the property
• Offsite roadway improvements
• Capitol planning and maintenance plans

Countryside Drive Culvert Replacement
Traffic Signal Coordination and Timing